Bournemouth Hospital
RAK Technical carried out the design and installation to three treatment rooms which required temperature control. We installed three Daikin compact cassettes on a multi due to lack of space for condensers.
Date
september 2012
RAK Technical carried out the design and installation to three treatment rooms which required temperature control. We installed three Daikin compact cassettes on a multi due to lack of space for condensers.
september 2012